Plan the old panels before the upgrade
Ask your installer who will manage removed panels and when they will be ready. Knowing the count and collection point ahead of time helps avoid a pile of panels being left without an agreed destination. Mention your proposed replacement date when you enquire.
Panels and mounting metal are different loads
If your project includes aluminium rails, copper cable or other removed equipment, list those separately. A metal quote should not be taken as confirmation that panels, inverters or batteries are accepted under the same arrangement. Each stream needs its own details.